Building Lasting Value

When pre-planning is done properly, more of the project can be prepared or assembled in a controlled environment. This can increase the quality control of the work, reduce labor needs on site to the benefit of the job site schedule, and reduce the number of workers needed on site that cause trade stacking.

From any phase of the project from design, pre-construction, or even during construction, our fabrication methods can identify opportunities to help lower costs, build in value, and support the project schedule.

Fabrication is more than just assembling components in a warehouse. We take it to the next level by breaking a project down in to separate tasks in separate zones. From that point we determine what we can fabricate. Anything we cannot, we package up the rest with all associated information needed for that scope of work and deliver it to that specific area of the job site.

Why fabricate?

  • Overall savings for the job
  • Reduce time on schedule
  • Reduced manpower on site
  • Increase flexibility with schedule changes
  • Improved trade coordination
  • Reduced on site storage
  • Less waste handled on site

HAVE A QUESTION?

253-875-8650

To find out more, please call us or fill out the message form and we’ll get back to you within 24 hours.