Point Ruston Baker Building
Client: Point Ruston
Location: Tacoma, WA
Year Completed: 2018
An 8-story condo building at Point Ruston on the water front consisting of 166 condos, common areas, and a 5th floor courtyard.
Client: Point Ruston
Location: Tacoma, WA
Year Completed: 2018
An 8-story condo building at Point Ruston on the water front consisting of 166 condos, common areas, and a 5th floor courtyard.
Client: Point Ruston
Location: Tacoma, WA
Year Completed: In Progress
An amazing 6 story retirement facility with assisted living apartments, a memory care division, full commercial kitchen, recreation area, and a rehabilitation facility including a workout room and pool.
Client: Washington State Fair
Location: Puyallup, WA
Year Completed: 2017
Building a new dairy barn, milking parlor, and show arena for the fair. The barn was built as a multi-function facility to be used for anything from a barn, to weddings and concerts or anything in between. This included an extensive lighting control system, AV, and power to support any function.
Client: Washington State Fair
Location: Puyallup, WA
Year Completed: 2019
Sillyville is a new 1.2 acre mini-farm to educate kids about the importance of agriculture in our region. There are 6 buildings, each of which show a part of the farming process.
Client: Port of Tacoma
Location: Tacoma, WA
Year Completed: 2018
Brand new building where we installed the electrical, telecom, and fire alarm for this unique geometry building that presented some exciting, but fun, challenges.
Client: Clover Park Technical College
Location: Lakewood, WA
Year Completed: In Progress
This 63,000 square foot building was built to serve mechatronics, composites, manufacturing, and non-destructive testing career paths. Building layout consists of classrooms, laboratories with equipment, and a presentation area. The building was fully designed and modeled with collaboration between all building disciplines and owner representatives including end users, maintenance and IT.
Client: UW YMCA
Location: Tacoma, WA
Year Completed: 2014
New two story University of Washington YMCA. This building consists of a new work out rooms, a full college level gym with basketball court, running track, locker rooms and conference rooms with AV integrations with lighting shades and projector screens.
Client: JBLM
Location: Joint Base Lewis-McChord, WA
Year Completed: In Progress
New construction of four, three story buildings with 162 apartments that will provide housing for 324 soldiers. Each apartment has it’s own kitchen/restroom/utility area and two bedrooms.
Client: University Place Presbyterian Church
Location: University Place, WA
Year Completed: 2019 A remodel of the University Place Presbyterian Church- including upgrading the preschool wing and adding additional classrooms, converting an open area into a children’s worship room with a stage for performances, converting the upstairs to a social hall with a coffee stand, building a new nursery, and rebuilding the entry way to make it more inviting.